Output | 100-200KV |
---|---|
Input | 1.5KW |
Focus Spot | 1.5x1.5 |
Max Penetration | 30mm |
Material | Steel |
Output | 150-300KV |
---|---|
Input | 2.5KW |
Focus Spot | 1.5x1.5 |
Max Penetration | 50mm |
Material | Steel |
Output | 60-160KV |
---|---|
Input | 1.5KW |
Focus Spot | 0.8x0.8 |
Max Penetration | 18mm |
Material | Steel |
The Size Of The Film | 8 X 10 Cm To 43 Cm Wide |
---|---|
The Running Time | 7 Minutes To 23 Minutes |
Inlet Velocity | 322~92 Mm / Min |
Volume (long * Width * Height) | 100 X 70 X 64 Cm (including Stent 106 Cm) |
Weight | 85 Kg (tank Without Liquid) 115 Kg (filled With Water) |
The Size Of U Film | Minimum 60 * 100mm, The Widest 450mm Width And The Longest Film Length Is 60 Meters |
---|---|
Washing Volume | 350*430mm 180 Sheets / Hour; 100*360mm 720 Sheets / Hour. |
The Development Temperature | Adjusted From 20.0-40.0℃ (+ 0.3℃). |
Fixing Temperature | Adjusted From 20.0-40.0℃ (+ 0.3℃) |
The Control Precision Of U Drying Temperature | 40-70℃is + 5℃ Out Slice Way Back Film |
Output | 100-200KV |
---|---|
Input | 1.5KW |
Focus Spot | 1.5x1.5 |
Max Penetration | 29mm |
Material | Steel |
Output | 150-300KV |
---|---|
Input | 1.5KW |
Focus Spot | 2.5x2.5 |
Max Penetration | 50mm |
Material | Steel |
Output | 30-160KV |
---|---|
Input | 1.5KW |
Focus Spot | 1.0x1.0 |
Max Penetration | 18mm |
Material | Steel |