| Packaging Details | Standard export package |
|---|---|
| Delivery Time | 1-4days |
| Payment Terms | T/T, Paypal, Western Union |
| Supply Ability | 500pcs per month |
| Place of Origin | Beijing |
| Delivery Width | 360mm |
|---|---|
| Running Time | 60S Per (14 "X17") |
| Dry Weight | 8 X 350mm (4 * 14), 270 Pieces Per Hour |
| Power | 200-240V 50/60Hz 5A |
| Water Consumption | 2 Liters / Minutes Of Film Operation |
| The Size Of The Film | 5 X 10 Cm To 35 Cm Wide |
|---|---|
| Run Time | 6 Minutes -15 Minutes (10 Gear Adjustable) |
| The Film Speed | 90 Mm / Min (running Time Is 6 Minutes). |
| Power | 220~240V6A 50 Or 60Hz |
| Volume | (long * Width * High) 82 X 52 X 42 Mm |
| Type Of Film | X Optical Film |
|---|---|
| Film Specification | Minimum 4 X 10 Cm To 35 Cm Wide |
| Tablets | 160 Pieces / Hours For All Dental Films |
| Developing Temperature | 28-37 C |
| Drying Temperature | 20-70 Centigrade |
| Packaging Details | Standard export package |
|---|---|
| Delivery Time | 1-4days |
| Payment Terms | T/T, Paypal, Western Union |
| Supply Ability | 500pcs per month |
| Place of Origin | Beijing |
| Film Specification | Minimum 10*10cm Maximum 35*∞cm |
|---|---|
| Flushing Time | 105、135、165sec |
| Developing Time | 28、36、44sec |
| Flushing Volume | 80 Pieces / Hours(14"*17")120 Pieces / Hours(11"*14") |
| Drug Tank Capacity | Developing, Fixing, And Washing Each 5.2L |
| Measurement Range | Cumulative Dose Hp(10): 0.0mSv~10Sv;Dose Rate Hp (10): 1mSv/h~500mSv/h |
|---|---|
| Relative Error | <±10% (1mSv/h,Cs-137) |
| Energy Response | <±30%(50keV1.5MeV) |
| Alarm Method | Sound And Light Alarm And LCD Display Indicator |
| Appearance Size | Φ49㎜×16㎜ (not Including Wristband) |
| Packaging Details | Standard export package |
|---|---|
| Delivery Time | 1-4days |
| Payment Terms | T/T, Paypal, Western Union |
| Supply Ability | 500pcs per month |
| Place of Origin | Beijing |
| Use | Industry |
|---|---|
| Pack | 10pcs Each Pack |
| Packaging Details | Standard export package |
| Delivery Time | 1-4days |
| Payment Terms | T/T, Paypal, Western Union |
| The Running Time | 4.5 To 14 Minutes |
|---|---|
| Chip Speed | 100~33 Mm / Min |
| Development Time | 60-180 Seconds (recommended For 90 Seconds) |
| Washing Volume | 350*430mm 20 Sheets / Hour; 80*300mm 80 Sheets / Hour (P14A) |
| Water Temperature | 5~30 Degree |